They just told me it is a something called "point 40" (which means that its fully built and completed) and that it is about to be loaded and shipped.
so i HOPE that means;
3-4 weeks on the water (hopefully)
2 weeks being compliance checked etc
so we could have them in our garages in 5-6 weeks, which puts us about mid to late september, which is when i expected it.